I’m starting to feel overwhelmed by the amount of things I need to complete for/before Christmas. I figured if I write it down, it might occur to me that I need to kick it up a notch on the productivity side.
Here is my current to do.
Swaps~October 6”-12” mini – Need to cut, piece, quilt, label, bind, package, mail.
~October Swap Till You Drop- Need to package, mail.
~Doll Quilt Swap 5 – Need to cut, piece, quilt , label, bind, package, mail.
~November swaps (I shouldn’t even sign up for these but I know I will).
Christmas~Black& White Quilt - Needs back pieced, quilted, label made, binding.
~Nintendo Quilt - Needs 8 more blocks cross stitched, top pieced, quilted, label, binding.
~Table runner - Needs hand quilting and label. (see sneak peek photo below).
~Table runner - Need to decide pattern, pieced, quilted, binding, label.
~Ornaments for friends – decide what to do and do it.
~Baby Quilt 1- Needs rows sewn, quilted, label, binding.
~Baby Quilt 2 - Need to decide pattern, cut, piece, quilt, bind, label.
Did I mention that I want to be finished before December 1st so I can enjoy the month? haha
Anyone else in this boat?
Here is a picture of one of table runners.

The fabric is It’s Snowing Charm Pack from Moda. Purchased from
crazyquiltgirlfabricshop.com. The binding which you can't really see in this photo is from the same line from the
Fat Quarter Shop. The other table runner I will be making is from the Moda
Peace on Earth also from crazyquiltgirl. The Peace on Earth charm pack is beautiful.